2017-05-30
This was the first hornet to visit us in more than 9 years in Danmark. I had never seen a wasp this big.
Oh and by the way, clean the toilet if you made stripes in the bowl. It is standing at the back of the toilet, directly behind the plate where the bowl is mounted on. N.B. Depth ca 1.2m width ca. 0,3m. Next time Johan comes, maybe he can reach it.
vrijdag 9 februari 2018
Finishing touches
2017-05-03
Almost ready in three days the guests must be able to use it.
The black tile in the corner of the shower is on both sides and was inspired by the semi-finished product I wrote about before.
2017-05-06 Arrival day.
Floor-heating is not yet functioning. The rest is in place.
Almost ready in three days the guests must be able to use it.
The black tile in the corner of the shower is on both sides and was inspired by the semi-finished product I wrote about before.
2017-05-06 Arrival day.
Floor-heating is not yet functioning. The rest is in place.
Tile Tetris
2017-04-21
Tiling the floor.
Tetris with floortiles.
You can not be to carefull when cutting tyles: you need to protect your hearing, seeing and breathing.
Tiling the floor.
Tetris with floortiles.
You can not be to carefull when cutting tyles: you need to protect your hearing, seeing and breathing.
Haute cuisine
2017-04-17
Cheese cake tested: Yes this one is al dente.
The cake was on its way to the inside of the frig. But it did not complete the trip. It was balanced all the way from the restaurant on one hand. And in the last 0.5 meter it slipped and ended on the front of the frig. Everything that is no longer than 10 seconds on the ground can be saved for private consumption. Sorry guests, this rule does not apply to your food even if you wanted to, we do not want to serve you this. And on top of that it is not allowed.
We had a good laugh and enjoyed the cake with a cup of tea.
Cheese cake tested: Yes this one is al dente.
The cake was on its way to the inside of the frig. But it did not complete the trip. It was balanced all the way from the restaurant on one hand. And in the last 0.5 meter it slipped and ended on the front of the frig. Everything that is no longer than 10 seconds on the ground can be saved for private consumption. Sorry guests, this rule does not apply to your food even if you wanted to, we do not want to serve you this. And on top of that it is not allowed.
We had a good laugh and enjoyed the cake with a cup of tea.
Tiling Brig Bathroom
2017-04-07
Tiles on the walls after coating them with rubbersealer.
I kind of liked the dark blue of the sheetrock an it inspired us to do:...... (....but that comes later)
What is this, can these cats of ours not stay clear of our work? Caught (red handed) grey pawed.
Tiles on the walls after coating them with rubbersealer.
I kind of liked the dark blue of the sheetrock an it inspired us to do:...... (....but that comes later)
What is this, can these cats of ours not stay clear of our work? Caught (red handed) grey pawed.
Labels:
Bed and Breakfast,
Bedrijf,
Bouw,
Onderhoud
Brig Bathroom Building as usual.
2017-04-01
Work continues
How long does it take to get concrete in its place on Møn. It takes 4 weeks. It sounds like a bad joke.
Then we were ready to close the hole between the two rooms.
and start on the little wall to accommodate piping.
and a washing stand.
We know how to work with Faay elements (VP54). These are not WR so we have to coat them with rubber.
2017-04-07
Putting up sheet rock with WR, Putting the piping in place and preparing for the thermostatic bath shower mixer.
Work continues
Then we were ready to close the hole between the two rooms.
and start on the little wall to accommodate piping.
and a washing stand.
We know how to work with Faay elements (VP54). These are not WR so we have to coat them with rubber.
2017-04-07
Putting up sheet rock with WR, Putting the piping in place and preparing for the thermostatic bath shower mixer.
dinsdag 6 februari 2018
Bathroom for Brig & Brigantine
2017-01-31
We started on giving the Brig and Brigantine their own (shared) bathroom.
First take out the Furniture.
Than take out the concretefloor.
Install new Water and Floorheating from the top.
New sewagepipes.
New isolation and floorheating
With standard cat-inspection
We started on giving the Brig and Brigantine their own (shared) bathroom.
First take out the Furniture.
Than take out the concretefloor.
Install new Water and Floorheating from the top.
New sewagepipes.
New isolation and floorheating
With standard cat-inspection
Abonneren op:
Posts (Atom)