vrijdag 9 februari 2018

Brig Bathroom Building as usual.

 2017-04-01
Work continues
How long does it take to get concrete in its place on Møn. It takes 4 weeks. It sounds like a bad joke.
 Then we were ready to close the hole between the two rooms.
 and start on the little wall to accommodate piping.
 and a washing stand.
We know how to work with Faay elements (VP54). These are not WR so we have to coat them with rubber.

2017-04-07
Putting up sheet rock with WR, Putting the piping in place and preparing for the thermostatic bath shower mixer.