2012-07-10
Roth-Nordic supplies a nice floor-heating system.
Posts tonen met het label Heating CO2 neutral. Alle posts tonen
Posts tonen met het label Heating CO2 neutral. Alle posts tonen
vrijdag 7 december 2012
donderdag 6 december 2012
Floorheating System
2012-06-12
Today continued on installing the maze of pipes to put heating into the rooms.
Wood chip plates to support the floor piping and the laminate on top. But first the Styrofoam has to be installed.
Today continued on installing the maze of pipes to put heating into the rooms.
Wood chip plates to support the floor piping and the laminate on top. But first the Styrofoam has to be installed.
Labels:
Bed and Breakfast,
Bouw,
Heating CO2 neutral,
Hotel
woensdag 15 februari 2012
It's cold outside and our Baxi is giving troubles.
2012-02-02
After years of hard labor, some gaskets of our CO2 neutral central heating system are deteriorating. They have no elasticity anymore. So when air goes the wrong way it starts to burn the pellets inside the container. This is NOT good. The first gasket on the lid of the container we replaced did not do the trick, sure the top was closed now, but air was flowing around the inlet-duct and burning away on the storage container. Part of the plating had been that hot, that it had deformed. On Saturday we stopped the heater got a gasket and separated the storage container and the furnace part. We needed to hammer the plate in shape again. Imagine leaning in to the side of the container(empty it as the acoustic properties of a church-bell), and banging away on it with a 2 kg hammer with your hand inside and your ear almost pressed to the steel. We tried to use a hydraulic jack, but that can not be used horizontally. After 3 hours we could start heating up the house and restaurant again.Temperatures outside were between -3 and -6 Centigrade.
After years of hard labor, some gaskets of our CO2 neutral central heating system are deteriorating. They have no elasticity anymore. So when air goes the wrong way it starts to burn the pellets inside the container. This is NOT good. The first gasket on the lid of the container we replaced did not do the trick, sure the top was closed now, but air was flowing around the inlet-duct and burning away on the storage container. Part of the plating had been that hot, that it had deformed. On Saturday we stopped the heater got a gasket and separated the storage container and the furnace part. We needed to hammer the plate in shape again. Imagine leaning in to the side of the container(empty it as the acoustic properties of a church-bell), and banging away on it with a 2 kg hammer with your hand inside and your ear almost pressed to the steel. We tried to use a hydraulic jack, but that can not be used horizontally. After 3 hours we could start heating up the house and restaurant again.Temperatures outside were between -3 and -6 Centigrade.
Abonneren op:
Posts (Atom)