2017-05-03
Almost ready in three days the guests must be able to use it.
The black tile in the corner of the shower is on both sides and was inspired by the semi-finished product I wrote about before.
2017-05-06 Arrival day.
Floor-heating is not yet functioning. The rest is in place.
vrijdag 9 februari 2018
Abonneren op:
Reacties posten (Atom)
Geen opmerkingen:
Een reactie posten